Public Institution Mandatory Installation Program

Engineered to withstand moisture, heat, and impact — redefining the lifespan of building-integrated BIPV.

Public Institution Mandatory Installation Program

A program requiring public institutions to source a minimum percentage
of the energy needed for newly built, expanded, or remodeled buildings with a total floor area of 1,000 ㎡ or more from renewable energy

Image
Image

Mandatory Installation Ratio by Year

The mandatory installation ratio is being raised year by year, and by 2030 public buildings will be required to source 40% of their energy needs from renewable energy.
‘ 20 ~ ’21 ‘ 22 ~ ’23 ‘ 24 ~ ’25 ‘ 26 ~ ’27 ‘ 28 ~ ’29 ‘ 30 ~
30% 32% 34% 36% 38% 40%

Adjustment Coefficient

New & Renewable Energy Source Annual Recognized Energy Production per 1kW Installed
Category Type Unit Production Correction Factor Total Unit Production (kWh/kW-year)
Solar PV (Building-Attached) 1,358 0.95 1,290
BIPV (Building-Integrated) 923 6.12 5,649

Need a BIPV
quote?

Tell us about your installation site and our team will get back to you.

Quote Inquiry